On a building site, a crane booking is part of a programme. Trades are waiting, deliveries are scheduled and a late crane costs more than the hire. Here is how we fit Franna lifts into construction work.
Lifts on building sites
- Structural steel: columns, beams, portal frames and lintels
- Roof trusses and roofing packs lifted to the top plate or roof
- Precast stairs, panels, pits and lintels
- Site sheds, toilets and storage containers at set-up and relocation
- Materials to upper floors: bricks, blocks, plasterboard and frames
- Plant and equipment placement at practical completion
Fitting the programme
- Book early. Tell us the date range as soon as you have it, then confirm the day.
- Coordinate deliveries. Lifting straight off the truck saves double handling.
- Group lifts. Steel, trusses and materials in one booking cuts travel and minimums.
- Weekend options. Saturday lifts keep trades moving without blocking the weekday site.
Residential builders
Brisbane's residential builders work on tight blocks, sloping sites and renovations of raised homes. Pick-and-carry cranes handle steel beams for open-plan conversions, lifted-house extensions, truss lifts on two-storey homes and pool shells at handover. Street access, powerlines and neighbours' driveways shape most of these lifts.
Commercial builders
On commercial sites, cranes are often booked for steel erection days, precast installation, plant installs and site establishment. Site inductions, SWMS and lift plans are standard, and we work within your site's safety system.
Paperwork
Site inductions, insurance certificates and safe work method statements can be supplied before the lift. Let us know what your site needs when you request a quote.
A typical build, stage by stage
Site establishment
At the start of a project, site sheds, toilets, storage containers and sometimes fencing materials need to be placed. A pick-and-carry crane can set them out quickly, working along the site from one pad to the next. If the site layout changes later, the same buildings can be moved.
Slab and structure
Once the slab is down, steel columns, beams, precast elements and stairs may need lifting. On residential jobs that might be a single steel beam over an opening; on commercial jobs it can be a full day of steel erection with a rigging crew.
Roof
Trusses and roofing packs are lifted to the top plate or roof structure, ready for the roofers. Landing the packs where the structure can take them, and spreading them across the roof rather than piling them in one spot, is part of the plan.
Services and plant
Air-conditioning units, hot water systems, tanks and switchboards often need lifting into position near practical completion.
Landscaping and handover
Pool shells, spas, large rocks, planter boxes and outdoor structures are common final lifts before handover.
Working within your site safety system
Builders run sites under their own safety systems. We work within them: completing inductions, providing insurance certificates and safe work method statements, following permit-to-work requirements and attending pre-start meetings where required. The crane operator will also complete their own pre-start and site checks.
Lift studies and planning for complex lifts
Most building lifts are straightforward and planned using the load chart, site information and photos. Some lifts, such as heavy loads near the limit of the crane, lifts over occupied buildings or tandem lifts, need more detailed planning. Tell us if your project requires a formal lift plan or engineer sign-off, and we will discuss what is needed.
Common delays and how to avoid them
- Delivery late: confirm delivery windows with suppliers and allow buffer time.
- Access blocked: keep the crane path clear of trades' vehicles and materials.
- Load not ready: make sure steel is marked, precast is checked and lifting points are accessible.
- Permits missing: confirm road and footpath approvals well before the day.
- Weather: have a backup day in storm season.
Residential builders on tight blocks
Brisbane's residential builders often work on narrow, sloping lots with little space for cranes. Lifts are often done from the street, with traffic control, or from the driveway. We look at the access and plan the crane position to minimise disruption to neighbours.
Questions Brisbane customers ask
Can you lift trusses onto a two-storey house?
Often, yes, depending on the truss pack weight, roof height and how close the crane can get.
Can you supply SWMS and insurance certificates?
Yes. Tell us your site requirements when you request a quote.
Do you do Saturday lifts for builders?
Yes. Weekend bookings are available.
Can you set out site sheds on a new commercial site?
Yes. Site establishment is a common lift.
Can you provide a lift plan?
We plan every lift. For complex lifts that need formal documentation, tell us and we will discuss requirements.
Can you lift trusses on a sloping block?
Often, yes, depending on the slope, reach and crane position.
Where is the lift and what is it?
Tell us the suburb, what needs lifting and roughly how heavy it is. Add photos of the site entry and where the crane would park, and we will come back with a clear written quote.
- Licensed and insured crane operators
- After-hours and weekend lifts available
- Brisbane, Gold Coast and Sunshine Coast
- No obligation – you approve before anything is booked
Prefer email? info@brisbanefrannacranehire.com.au
Request Received
Thanks ! Someone from Brisbane Franna Crane Hire will call you back shortly. For emergencies right now, please call us directly.
Call 07 3106 1834



